Thursday 26 February 2015

More Work on the Kitchen


A big hole in the floor


That's better


The fridge in place



And the microwave


Still quite a lot to do, but it's taking shape

Wednesday 25 February 2015

The Kitchen - Re-visited (Again)

This is the third and final attempt at fitting the kitchen.


This is much stronger than the previous ones that made use of  the caravan units
It has also been moved right into the corner to make room for a fold out table & drawers


This way I can make the cupboards the size I want to fit the fridge etc


The doors will be made from 18mm mdf painted gloss white

Saturday 14 February 2015

Back To It

Well it's about five weeks since I worked on the van, things have been happening in my life that didn't leave much spare time.
But life goes on and the weather has got a bit milder so time to get stuck in and get this conversion done.


The wardrobe sorted.


And the toilet in place, most of the floor covering is down as well.